Concrete Calculator: Volume, Materials & Mixer Payback
Work out how much concrete you need, the cement, sand and gravel for it, and whether a self-loading mixer pays for itself on your job. Free, no sign-up, works in metric and imperial.
Want the numbers checked for your project?
Send us your daily volume and local prices — we will size a machine and put the payback in writing.
Get a quoteHow the concrete volume is calculated
For a slab, footing, strip foundation or wall the volume is simply length × width × thickness. For a round column it is π × radius² × height. The result is multiplied by the number of identical elements and then by the waste allowance — 5 % is normal for slabs poured on a good sub-base; use 8–10 % for uneven ground, footings dug by hand or small scattered pours.
Enter thickness in centimetres (or inches) and plan dimensions in metres (or feet); the calculator converts everything to cubic metres and cubic yards (1 yd³ = 0.7646 m³).
Where the material quantities come from
Cement, sand, gravel and water are worked out from a typical nominal mix for each strength class, per cubic metre of finished concrete:
- C20/25 — about 300 kg cement, 780 kg sand, 1,150 kg gravel, 180 L water
- C25/30 — about 340 kg cement, 740 kg sand, 1,150 kg gravel, 180 L water
- C30/37 — about 380 kg cement, 700 kg sand, 1,130 kg gravel, 175 L water
Treat these as ordering estimates. Real mixes vary with aggregate size, moisture and admixtures, and a structural pour should always follow the mix design your engineer specifies. A self-loading mixer weighs every batch electronically, which is what makes a written mix design repeatable on site.
Working from a different grade system — M25, B25, f’c 250 kg/cm² or 3,500 psi? Look it up in the concrete grade conversion chart.
How the payback is calculated
The second tab compares a self-loading concrete mixer with what you use today:
- Against ready-mix: your cost per m³ becomes materials + fuel + one operator + maintenance, spread over the concrete you produce in a year. The saving is the difference from the delivered ready-mix price.
- Against a small drum mixer and crew: materials are bought either way, so only labour and running costs are compared — the whole crew’s wages against one operator plus fuel and maintenance.
Payback (months) = machine price ÷ net annual saving × 12. Machine prices are our published FOB starting prices; add freight and import duty for your country for a landed figure. The reasoning behind the labour side is explained in how a self-loading mixer replaces 4–6 workers.
About 6 to 8 bags of 50 kg, depending on strength: roughly 6 bags for C20, 7 for C25 and 8 for C30 with a typical nominal mix.
10 × 5 × 0.15 = 7.5 m³. With a 5 % waste allowance, order about 7.9 m³ — two to three batches for a 3.5–4 m³ self-loading mixer.
Around 5 % for slabs on a level, compacted base, and 8–10 % for hand-dug footings, uneven ground or many small pours.
It depends mostly on two numbers: the gap between the ready-mix price and your own materials cost, and how many workers the machine replaces. Where ready-mix is expensive or far away the saving per m³ is large and payback is fast; against a cheap manual crew it takes longer. Enter your own local prices to see your figure.
Use this calculator on your site
You are welcome to link to this calculator from your website, course notes or forum post. Copy the code below: