HOME / News / Cement mixer operating steps?
Return

Cement mixer operating steps?

Visit:66 CategoryNews

1. Before the cement mixer works, it must be checked to confirm that the steering, braking, lighting and signal systems are sensitive and effective. The mixer drum and chute are free from cracks and serious damage. The mixing blades wear is in the normal range. The U-bolts between chassis and sub-frame are well connected.
2: Understand the construction requirements and site conditions. Choose driving directions and parking locations.
3: Traveling on social roads must comply with traffic rules. The turning radius should meet the requirements of the instruction manual and the speed should not exceed 15km. The inbound speed must be no more than 5km.
4: Do not touch the rotating drum and trolley with hands during work.
5: When the cement mixer is reversing and unloading, the operator must obey the command, pay attention to the surrounding environment, and park immediately when an abnormality is noticed.
6: It is strictly forbidden to carry out the cleaning operation of the cement mixer under the high-voltage line.

[contact-form-7 id="750" title="Inquiry"]